Every Machine Leaves With a Measured Report
Machine quality is built through controlled verification at every stage — key components are checked on arrival, assembly accuracy is monitored during production, and machine geometry is verified before final acceptance.
Before delivery, agreed machine functions, accuracy and sample-machining results are documented through inspection and FAT records, giving customers measurable data they can review again during installation and production start-up.
Key machine components and critical purchased parts are checked against technical requirements before assembly.
Assembly accuracy, alignment and key production steps are checked against documented specifications throughout the build process.
Machine geometry, spindle accuracy, axis positioning and key functional performance are verified before acceptance.
Factory acceptance results, sample-machining data and agreed inspection records are documented before shipment.
Materials and bought-out components verified against specification.
First-article and in-process inspections through machining and assembly.
Geometry and alignment re-measured on the completed machine.
Final acceptance test with report — the baseline for installation day.